Guide
What to do, and when
Most of what shortens a roof is neglect of things that take twenty minutes: a blocked valley, a lifted flashing, a gutter full of grit.
Or call (951) 576-6200Get it looked at
Three questions, and up to three Menifee contractors. Free either way.
Your request is in.
We are matching it now against roofing contractors working in Menifee and the surrounding area.
- Today, usually within the hour. The first contractor calls or texts the number you gave us. ASAP requests go out first.
- Up to three of them, no more. We cap it at three so you can compare without your phone melting.
- They come and look. Estimates are given after somebody has been on the roof, not over the phone.
- You decide, or you do not. There is nothing to cancel and nothing to pay us.
If you do not hear anything today, check your voicemail and spam folder — contractors often call from a mobile number.
Twice a year, from the ground
You do not need to be on the roof to find most problems. A slow lap of the house at a low angle finds nearly all of them.
Deal with growth properly
Moss and algae hold water against the surface. Treat and brush gently, or fit zinc or copper strip near the ridge. Never pressure wash an asphalt roof — it strips the granules and takes years off it in an afternoon.
Keep the penetrations honest
Rubber pipe boots are the single most common source of leaks on an otherwise sound roof, and they are cheap to replace before they fail.
Look in the attic after heavy weather
Check after the first real weather of the season rather than at the end of it. A small stain found in autumn is a cheap repair; the same stain found in spring is not.
Clear the gutters before the wet season
Gutters full of grit are not just a drainage problem — the grit is your roof, and its presence tells you something about how far along the covering is.
Cut back anything touching the roof
Overhanging limbs cause three problems at once: abrasion, permanent shade that keeps a slope damp, and a highway for rodents into the attic.
In short
Put two dates in the calendar, one either side of November through March. That is the whole programme.
Related questions
Can I stay in the house while it is done?
Most people do. Expect noise from early morning, dust in the attic, and a day where the driveway belongs to the crew.
What warranty should I expect?
Two separate things. The manufacturer covers the material for its rated life, but only if it was installed to their specification. The contractor covers workmanship, commonly five to ten years, and only for as long as they are trading.
Do I need a permit?
Almost certainly, for a full replacement. The contractor should pull it, and the fee should be a visible line on the quote rather than a surprise.
Find out what it costs
No cost, no obligation, and never more than three contractors.